Kestrel Building Supplies — Regional flatbed distribution

On model

Commenced Jun 2025 · 4 years · from tender T-2025-003

Model margin
7.4%
Actual margin (LTM)
7.6%
Variance
+0.2 pts
Actuals coverage
14 mo

Margin vs model

Actual 7.6%Model 7.4%
Jun 25Jul 26

Assumption outcomes

AssumptionModelActualVerdict
Backhaul recovery
Regional flatbed backloads ahead of plan — the only assumption in memory that beat its model.
20% of legs26%OK
Maintenance cost / km
$0.11$0.12Watch
Volume
100% of forecast101%OK

Monthly actuals14 months

MonthRevenue $mModel %Actual %Δ pts
Jun 250.467.47.2−0.2
Jul 250.467.47.3−0.1
Aug 250.467.47.5+0.1
Sep 250.477.47.40.0
Oct 250.477.47.6+0.2
Nov 250.477.47.5+0.1
Dec 250.477.47.7+0.3
Jan 260.477.47.6+0.2
Feb 260.477.47.5+0.1
Mar 260.487.47.7+0.3
Apr 260.487.47.6+0.2
May 260.487.47.8+0.4
Jun 260.487.47.6+0.2
Jul 260.487.47.6+0.2

Review note

Twelve-month review: performing at or slightly above model. Crane-truck utilisation is the constraint to watch as volume grows.